Marine Survey Completed

20th February 2013: Marine Survey (sea bed) of the  proposed cable path between Port Vila and Suva has been completed.

Research Vessel “EGS Explorer” conducted a 1238km long, 1km wide, marine survey  between Suva, Fiji and Port Vila, Vanuatu.

Data contained within the EGS Survey Report released today shall be utilised by Alcatel’s engineering team in order to finalise the optimal cable route between Fiji and Vanuatu and cable engineering specifications of the cable.

CEO Simon Fletcher on the gangway of RV Explorer docked in Port Vila

CEO Simon Fletcher on the gangway of RV Explorer docked in Port Vila after completion of the survey.